Power Grid Emergency Management Capability Assessment Based on the Fuzzy-AHP Comprehensive Evaluation

Article Preview

Abstract:

According to the characteristics of power emergencies and integrating the realities of grid emergency management, the paper established grid emergency management capability evaluation indexes system, which is consist of 1 first grade indexe,15 second grade indexes. First, the paper determined the weight of each index with AHP and then evaluated the indexes system by fuzzy comprehensive evaluation in two levels. In numerical example, the paper took a provincial grid company emergency management capability assessment as an example, obtained scientific analysis results, proved the usefulness of the evaluation system, and pointed a clear direction for the grid companies’ emergency management construction in the future.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1092-1093)

Pages:

429-433

Citation:

Online since:

March 2015

Export:

Price:

* - Corresponding Author

[1] YUE Yang. Power grid emergency management system and emergency capability evaluation[D]. Narth China Electric Power University, (2011).

Google Scholar

[2] MENG Haijun. statistics laws of great blackouts at home and abroad and emergency disposal system assessment[D]. Narth China Electric Power University, (2008).

Google Scholar

[3] ZHAO Weiwei, ZHANG Jianhua, SHANG Jingfu, LI Sheng. Power System Large Scale Blackout Emergency Evaluation Index System and Its Application[J]. Automation of Electric Power Systems, 2008, 32(20): 27-31.

DOI: 10.1109/supergen.2009.5348318

Google Scholar

[4] TIAN Shiming, CHEN Xi, ZHU Chaoyang, XIE Yingjun. Theory of Electric Power Emergency Management and Its Technological Countermeasures[J]. Power System Technology, 2007, 31(24): 22-27.

Google Scholar